SMIT ROTTERDAM

a Billing Boats "Model BB478" Build log. An "Left click" on an image will show them in a higher resolution. When followed by a right click and "save picture as" or "open in a new tab" will give you the max possible resolution of 1600x1200 pixels

Thursday, 17 May 2012

Bridge Progress

›
Not a lot of progress I must admit, I'm still working (slowly) on the bridge and all of it's details, I painted it more or less...
Friday, 13 April 2012

Bridge interior

›
I found several pictures of buttons and old meters on the internet and used these in Visio where I created the toplayout of the desks (...
Friday, 9 March 2012

Dry Fit Preview of the Bridge

›
I continued with upper structure and the interior of the bridge. At this stage I’m still a bit uncertain about how detailed I want ...
Sunday, 4 March 2012

“common basic” tools

›
Here’s an picture of all the tools I have used during the build of the Smit Rotterdam so far. What it doesn't show is the airb...
Thursday, 1 March 2012

Rotating Radars

›
As I’m about to build the upper structure lots of decisions had to be made to make sure that all "special effects” will become as i...
Thursday, 29 December 2011

signal lamps

›
They just look great when illuminated !!

Mast

›
I installed the mast today, the mast itself  is pretty much as suggested by the kit, the only thing I added was a "parallel pipe...

Weathered cranes

›
I found some time to finish the cranes. For the yellow color (on the entire ship) I use "pale yellow" (no.81) as the base...
Sunday, 11 December 2011

Crane No.1

›
Finally I can present a preview of one of the 3 cranes. I used the kit version as a guideline and I tried to copy the original cranes a...
Saturday, 26 November 2011

Life Boats in place

›
 And here's the result after painting and weathering the lifeboats..

Life Boats

›
Also the lifeboats supplied by the kit, is a bit too simple compared to the real thing, so also here I added more detail. Again I used th...
1 comment:
Monday, 31 October 2011

Lower decks

›
I continued with the fine details on the lower decks and besides the cranes and the life boats I’m just about finished on these decks. I...
Sunday, 23 October 2011

"rusty look"

›
After the "shiny" look, here's the "rusty" look. I might have overdone it a bit, but after having looked at ...
Sunday, 9 October 2011

In theory she’s ready to sail now..

›
At this stage the rudders and the engines, propellers and shafts are in place. I added some visual details on the rudders and the only th...
Saturday, 1 October 2011

Bow with details

›
I continued with some fine detailing on the upper deck and finished it, only thing remaining is the mast and crane. I'm really satisf...
Tuesday, 27 September 2011

Lower deck complete

›
I completed the lower deck and finished it with an more "used and natural" look. For achieving this look I painted the parts in...
Friday, 23 September 2011

Life Boat

›
My version of the life boat, I added a few more details. The rope on the sides is copper wire (as this stays in the shape you bend it), a...

Equipped Lower deck preview part2

›
the still shining towing winches and the "rusty" towing bars..

Equipped Lower deck preview

›
I spend some time on the lower deck details and try to give it an worn out / used rusty look by using a technique (found on the internet) c...
Thursday, 22 September 2011

Colorful and shiny

›
Here she is with all her colors except the white stripes.. The colors I used are humbrol enamel paint no.48 "Mediterranean Blue...
‹
›
Home
View web version
Powered by Blogger.